After a week basically non-stop rain, our concrete slab has been poured. They actually did it in the rain which had Chris freaked out, but it worked out.
Next Step: Framing.
The superintendent told us the house will be done in 90 days. That ends up being August 13, or the day we go back to work for the next school year. So hopefully it won't be any later.
This is looking from the garage to the other side of the house.
This is standing in the master bedroom.
This is Carter standing where the master bath will be. She is adorable in her ponytail and flip flops, which she just loves.
Next week, it should all be framed up!